Flowline EchoPod UG01 & UG03 Reflective Ultrasonic Level Transmitters
Multi-function transmitter for continuous level measurement up to 9.8 ft. (3m) with a 4-20 mA analog signal output and four relays.
- By Flowline
-
Some models in stock. View available part numbers.
Overview
Features
- Measurement ranges:
- 1.5 in. to 4.9 ft. (3.8cm to 1.5m) (UG01)
- 4 in. to 9.8 ft. (10.1cm to 3m) (UG03)
- Fail-safe diagnostics
- Selectable relay & signal outputs
- 2 in. (5cm) beam width for limited space applications
- Corrosion resistant PVDF transducer
- 1.5 in. (3.8cm) dead band maximizes tank filling capacity
- Temperature compensation from -40° to 80°C.
- Four programmable relays with embedded control logic:
- 1 pump or valve with 3 alarms
- 2 pumps lead-lag with 2 alarms
- 2 pumps duplexing with 2 alarms
- 4 independent switch point alarms
- CE, RoHS compliance
Description
The Flowline EchoPod UG01 and UG03 reflective ultrasonic level transmitters offer continuous level measurement up to 9.8 feet (3m) and feature a 4-20 mA analog signal output and four relays. Additionally, configuration of the UG01 and UG03 can be done via WebCal software (free download). What makes this Flowline EchoPod ultrasonic level transmitter stand out is its proprietary Reflective Technology™ which allows for reliable measurement in condensing environments.
Each relay of the Flowline EchoPod UG01 and UG03 reflective ultrasonic level transmitters can be configured for alarm, automatic fill or empty functions. Common applications for these EchoPod units include day tank, IBC or drum, cooling tower, ski or machine, process tank and waste sumps. Additionally, the UG01 and UG03's Reflective Technology™ make it an ideal fit for small tanks with non-foaming or highly vaporous media such as chemicals, water, wastewater and oil.
WebCal software is a PC utility program that enables users to easily configure and test compatible Flowline level sensors to their measurement and control requirements.
Documents
Spec Sheets
- Flowline Liquid and Solids Level Measurement and Control Brochure PDF (15.9 MB)
- Flowline EchoPod UG01 & UG03 Reflective Ultrasonic Level Transmitter Datasheet PDF (395 KB)
Manuals
- Flowline EchoPod UG01 & UG03 Reflective Ultrasonic Level Transmitter Quick Start Guide PDF (866 KB)
- Flowline EchoPod UG01 & UG03 Reflective Ultrasonic Level Transmitter Manual PDF (1.8 MB)
Software
Other
Links
Accessories
In Stock
| Part Number | Price | Available | |
|---|---|---|---|
|
UG01-0001-41 |
$645.00 | 2 in stock | |
|
UG03-0001-41 |
$725.00 | 2 in stock | |
Interested in Other Part Numbers?
Other part numbers are available to order but are not currently in stock. Current availability for non-stock parts is "Usually ships in 3-4 weeks". Click here to select options
Need Help? Call a Flow engineer at 1-800-884-4967
We're open 8:00 am to 5:30 pm ET